In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.ug环球开户(www.ugbet.us)开放环球UG代理登录网址、会员登录网址、环球UG会员注册、环球UG代理开户申请、环球UG电脑客户端、环球UG手机版下载等业务。
PETALING JAYA: KPower Bhd’s subsidiary – PKNP KPower Suria Sdn Bhd (PKSSB) – has obtained an extension from the Energy Commission (EC) for the development of a 50MW solar photovoltaic plant in Pahang.
In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.
,,皇冠体育注册平台(www.hg108.vip)是一个开放皇冠体育即时比分、皇冠体育官网注册的平台。皇冠体育注册平台(www.hg108.vip)专业解决皇冠体育会员怎么申请开户、怎么申请皇冠体育信用盘代理、皇冠体育公司的代理怎么拿的问题。
KPower said the scheduled commercial operation date had been extended to Dec 31, 2023 from Sept 30, 2023 while the tenure of the power purchase agreement or PPA was from 21 years to 25 years.
评论列表 (2条)
2023-05-24 00:04:33
澳5(www.a55555.net)是澳洲幸运5彩票官方网站,开放澳洲幸运5彩票会员开户、澳洲幸运5彩票代理开户、澳洲幸运5彩票线上投注、澳洲幸运5实时开奖等服务的平台。不错啦,可以看进去
2022-11-09 00:11:48
(www.huangguan.us)是一个开放皇冠即时比分、皇冠官网注册的平台。皇冠下载(www.huangguan.us)提供最新皇冠登录,皇冠APP下载包含新皇冠体育代理、会员APP。冲冲冲,上热门!!!